Services / New Store Setup & Remodels

04 / Build-Out

Merchandising and build-out for the work construction companies don't scope

As retailers expand their footprints with NTI (New To Industry) sites, a gap opens up between construction and grand opening — gondola construction and placement, walk-in cooler shelving and glides, and endcap and perimeter fixture installation typically fall outside the scope and expertise of the general contractor. MSCO closes that gap, merchandising and performing this work directly from the retailer’s floor plans and blueprints, on new builds and remodels alike.

“For remodel sites, MSCO can provide these services while the store stays open, with minimal disruption.”

MSCO New Store Setup Standard

A general contractor builds the shell. Someone still has to build the gondolas, place the fixtures, and get the walk-in cooler setup and organized before a single item hits the shelf — and that work rarely sits inside a construction company’s scope or expertise. MSCO fills that gap directly, working from the retailer’s floor plans and blueprints so the build-out matches the design intent exactly, not an approximation of it.

New-to-industry (NTI) sites get the full build-out treatment from empty shell to shelf-ready. Remodel sites get the same standard of work, executed around live store hours and existing traffic, so the location stays open and generating revenue while the reset happens around it — not despite it.

Precision from plan to open

The work that falls between “construction is done” and “the store is open” — handled end to end.

01

Construction Team Coordination

We plug into your general contractor’s timeline directly, so merchandising isn’t waiting on construction — or the other way around.

02

Floor Plan & Blueprint Execution

Every build-out runs directly from the retailer’s floor plans and blueprints, so the finished store matches the design.

03

Gondola Construction & Placement

Gondola runs built and placed to the retailer’s floor plan, aisle by aisle, before product ever arrives.

04

Walk-In Cooler Installation

Cooler systems installed and organized to spec, ready for stocking on day one.

05

Endcap & Perimeter Fixtures

Endcap and perimeter fixture installation executed to the design intent, not a field improvisation.

06

Grand-Opening Readiness

Fixtures, gondolas, and coolers staged and ready ahead of the opening date — not finished the morning of.

07

Remodels With Minimal Disruption

Remodel work executed around live store hours and existing traffic, so the location stays open through the process.

08

Multi-Site Rollout Scheduling

Coordinated build-out schedules across multiple NTI sites or remodel locations opening in the same window.

Grand-opening ready, top to bottom

New builds and remodels follow the same disciplined handoff from blueprint to shelf-ready.

STEP 01

Floor Plan Review

We confirm the retailer’s floor plan and blueprints against the construction timeline before scheduling crews.

STEP 02

Fixture & Gondola Staging

Gondolas, endcaps, and perimeter fixtures are staged and sequenced for build ahead of arrival on-site.

STEP 03

Build-Out Execution

Crews construct and place fixtures, install the walk-in cooler uprights and shelving, and build the store to spec.

STEP 04

Grand-Opening Readiness Check

A final walk-through confirms the store is shelf-ready ahead of the opening date, not the morning of.

STEP 05

Photo & Written Recap

Every location gets a visual and written recap confirming the build matches the plan.

Why partners trust MSCO with the build-out

Grand-opening day doesn’t move. Here’s what keeps the build-out on schedule.

Built From Your Blueprints

We execute directly from the retailer's floor plans and blueprints, so the finished store matches design intent, not a field guess.

Remodels Without Closing

Remodel work is scheduled around live store hours, so the location keeps generating revenue through the process.

Fills the Contractor Gap

Gondola construction, walk-in cooler setup, and fixture placement are work most general contractors don't scope — we do.

One Team, Every Site

Every crew member is a trained MSCO employee, so a multi-location rollout runs as one coordinated team instead of a patchwork of local subs.

Where construction ends, we begin

The shell is built; the store still isn’t. That’s the work we handle.

Retailers

NTI Site Openings

Get a new-to-industry location from empty shell to shelf-ready on the timeline your opening date demands.

Franchise Groups

Multi-Site Remodel Rollouts

Coordinate a remodel program across a franchise footprint with one team and one execution standard, store to store.

General Contractors

Merchandising Handoff

Hand off the gondola, fixture, and cooler work that sits outside construction scope to a team built specifically for it.

Free Quote

Ready to scope your next opening or remodel?

Share your site count, floor plans, and timeline. We’ll come back with a scoped proposal — usually within 5–7 business days.